[1]
Tomašková, M. a Marasová, D. 2012. ANALYSIS OF THE OPERATIONAL RISKS OF A BELT CONVEYOR USING THE METHOD OF DETERMINING THE OBJECT LIMITS. Perner’s Contacts. 7, 4 (pro. 2012), 157–164.