DEVELOPMENT OF METHODOLOGY FOR CAPACITY CALCULATION IN THE SECTIONS WITH AN INTERMEDIATE JUNCTION

Authors

  • Petr Veselý
  • Petr Krýže

Keywords:

capacity calculation, crossing or overtaking section, junction, CPM method, critical path, headway

Abstract

This article deals with the methodology of capacity calculation in the crossing or overtaking sections with one or more junctions. The basic methodology adumbrated in (1) is developed with emphasis on thorough specification of input data and the process of setting total time of occupancy of observed line with successive trains.

References

Downloads

Published

2011-12-30

Issue

Section

Articles

How to Cite

DEVELOPMENT OF METHODOLOGY FOR CAPACITY CALCULATION IN THE SECTIONS WITH AN INTERMEDIATE JUNCTION. (2011). Perner’s Contacts, 6(4), 300-307. https://pernerscontacts.upce.cz/index.php/perner/article/view/932

Similar Articles

1-10 of 300

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)