DEVELOPMENT OF METHODOLOGY FOR CAPACITY CALCULATION IN THE SECTIONS WITH AN INTERMEDIATE JUNCTION
Keywords:
capacity calculation, crossing or overtaking section, junction, CPM method, critical path, headwayAbstract
This article deals with the methodology of capacity calculation in the crossing or overtaking sections with one or more junctions. The basic methodology adumbrated in (1) is developed with emphasis on thorough specification of input data and the process of setting total time of occupancy of observed line with successive trains.
References
Downloads
Published
Issue
Section
License
Copyright (c) 2020 Petr Veselý##common.commaListSeparator##Petr Krýže

This work is licensed under a Creative Commons Attribution 4.0 International License.