[1]
“ANALYSIS OF THE OPERATIONAL RISKS OF A BELT CONVEYOR USING THE METHOD OF DETERMINING THE OBJECT LIMITS”, PC, vol. 7, no. 4, pp. 157–164, Dec. 2012, Accessed: Mar. 05, 2026. [Online]. Available: https://pernerscontacts.upce.cz/index.php/perner/article/view/1403