DERIVATION OF EQUATIONS OF MOTION FOR THE START OF AN ELECTRIC HOIST BY MEANS OF LAGRANGE EQUATIONS OF THE SECOND KIND
Klíčová slova:
Electric hoist, swinging of a load, DOF, Lagrange equations of the second kindAbstrakt
Solution of the start of an electric hoist is generally solved as the system with 2DOF; that is, translation motion of the hoist and rotational motion (swinging) of aload. However, in case of bulkier load can occur (e.g. due to wind forces) additionalrotation on the wire rope fitting and may cause exceeding of allowable angle of theload deflection. This detrimental swinging can affect service life of wire ropes. It isnecessary to receive better prerequisite for the solution of a swinging load.
Stažení
Data o stažení nejsou doposud dostupná.
Reference
[1] BRÁT, V., STEJSKAL, V., VOTÍPKA, F. Základy dynamiky strojů a konstrukcí. Praha:
Ediční středisko ČVUT, 1982. 282 s.
Ediční středisko ČVUT, 1982. 282 s.
Stahování
Publikováno
2010-12-30
Jak citovat
Vraník, P. (2010). DERIVATION OF EQUATIONS OF MOTION FOR THE START OF AN ELECTRIC HOIST BY MEANS OF LAGRANGE EQUATIONS OF THE SECOND KIND. Perner’s Contacts, 5(4), 280–285. Získáno z https://pernerscontacts.upce.cz/index.php/perner/article/view/1070
Číslo
Sekce
Články
Licence
Copyright (c) 2020 Pavel Vraník
Tato práce je licencována pod Mezinárodní licencí Creative Commons Attribution 4.0 .