IMPLEMENTATION OF GBAS SYSTEM AT THE VÁCLAV HAVEL AIRPORT
Keywords:
satellite systems in aviation, GBAS, low visibility conditions, precision approach, CAT I, CAT II/IIIAbstract
This paper describes possibilities of GBAS installation at the Václav Havel Airport in Prague. It contains possibilities of GBAS utilization at the approach and landing phase of flight, further evaluation of low-visibility conditions at LKPR and especially cost and benefits analysis.
Downloads
Download data is not yet available.
References
(1) NERI, P., L. AZOULAI a J. MULLER. GBAS NSE MODEL FOR CAT II/III
AUTOLAND SIMULATIONS. 4-6 May 2010, s. 14, ISBN: 978-1-4244-5036-7
Available at: http://ieeexplore.ieee. org/xpl/login.jsp?tp=&arnumber= 5507222&url=
http3A2F2Fieeexplore.ieee.orgFiel52F54929412F55071252F05507222.pdf3Farnumber3
D5507222BEHREND,
(2) Ferdinand a Oliver LEHMANN. CAT II / OTS CAT II OPERATIONS USING
EXISTING CAT I GROUND BASED AUGMENTATION SYSTEM. 30th Digital
Avionics Conference [online]. 2011, s. 11 [cit. 2013-03-31]. Available at:
http://www.eurocontrol.int/eec/public/standard_page/ETN_2010_2_GBAS_Full.html
(3) International Civil Aviation Organization: Annex 6, Aircraft operations, maintenance and
general aviation. Ninth Edition– July 2010. [cit. 2013-05-25] Available at:
http://www.icao.int/safety/ism/ICAO%20Annexes/Forms/AllItems.aspx
(4) Augmentation system principle and concept: GBAS (augmentation system). ACAC
seminar 17-18 Oct 2011, s. 18. [cit. 2013-01-25] Available at:
http://siraj.ec.pildo.com/uploads/Rabat/ files/GBAS_course.pdf FLY GLS
(5) GBAS facilities. Fly.gls.net: net - The future of precision approach [online]. 2013 [cit.
2013-03-29]. Available at: https://maps.google.com/maps/ms? msa=0&msid=
217875097500112150552.00049bf0be48258e49d8e&hl=en&ie=UTF8&t=m&ll=11.8673
51,17.578125&spn=152.799123,26.71875&z=1&source=embed
(6) AIP of the CR: Část 3 - Letiště. [online]. 2011 [cit. 2013-03-24]. Available at:
http://lis.rlp.cz/ais_data/www_main_control/frm_cz_aip.htm
(7) Conslutation with employee of Aviation Meteorological Services of the Czech Republic –
RNDr. Bohumil Techlovský
(8) Consultation with employee of Air Navigation Services of the Czech Republic – Ing.
Jakub Hocek
(9) REPORT ON THE EUROCONTROL XLS BUSINESS CASE STUDIES. EUROPEAN
AIR TRAFFIC MANAGEMENT PROGRAMME. 2010, pp. 150-205, ISBN 987-1-4233-
5370-4
AUTOLAND SIMULATIONS. 4-6 May 2010, s. 14, ISBN: 978-1-4244-5036-7
Available at: http://ieeexplore.ieee. org/xpl/login.jsp?tp=&arnumber= 5507222&url=
http3A2F2Fieeexplore.ieee.orgFiel52F54929412F55071252F05507222.pdf3Farnumber3
D5507222BEHREND,
(2) Ferdinand a Oliver LEHMANN. CAT II / OTS CAT II OPERATIONS USING
EXISTING CAT I GROUND BASED AUGMENTATION SYSTEM. 30th Digital
Avionics Conference [online]. 2011, s. 11 [cit. 2013-03-31]. Available at:
http://www.eurocontrol.int/eec/public/standard_page/ETN_2010_2_GBAS_Full.html
(3) International Civil Aviation Organization: Annex 6, Aircraft operations, maintenance and
general aviation. Ninth Edition– July 2010. [cit. 2013-05-25] Available at:
http://www.icao.int/safety/ism/ICAO%20Annexes/Forms/AllItems.aspx
(4) Augmentation system principle and concept: GBAS (augmentation system). ACAC
seminar 17-18 Oct 2011, s. 18. [cit. 2013-01-25] Available at:
http://siraj.ec.pildo.com/uploads/Rabat/ files/GBAS_course.pdf FLY GLS
(5) GBAS facilities. Fly.gls.net: net - The future of precision approach [online]. 2013 [cit.
2013-03-29]. Available at: https://maps.google.com/maps/ms? msa=0&msid=
217875097500112150552.00049bf0be48258e49d8e&hl=en&ie=UTF8&t=m&ll=11.8673
51,17.578125&spn=152.799123,26.71875&z=1&source=embed
(6) AIP of the CR: Část 3 - Letiště. [online]. 2011 [cit. 2013-03-24]. Available at:
http://lis.rlp.cz/ais_data/www_main_control/frm_cz_aip.htm
(7) Conslutation with employee of Aviation Meteorological Services of the Czech Republic –
RNDr. Bohumil Techlovský
(8) Consultation with employee of Air Navigation Services of the Czech Republic – Ing.
Jakub Hocek
(9) REPORT ON THE EUROCONTROL XLS BUSINESS CASE STUDIES. EUROPEAN
AIR TRAFFIC MANAGEMENT PROGRAMME. 2010, pp. 150-205, ISBN 987-1-4233-
5370-4
Downloads
Published
2013-07-12
How to Cite
Ambrožová, I., & Pleninger, S. (2013). IMPLEMENTATION OF GBAS SYSTEM AT THE VÁCLAV HAVEL AIRPORT. Perner’s Contacts, 8(2), 5–14. Retrieved from https://pernerscontacts.upce.cz/index.php/perner/article/view/726
Issue
Section
Articles
License
Copyright (c) 2020 Irena Ambrožová##common.commaListSeparator##Stanislav Pleninger
This work is licensed under a Creative Commons Attribution 4.0 International License.